ENMA 6010:  System Modeling, Analysis, and Simulation

 

Team Projects – Spring 2010

 


Project List

 

Sponsor

Title

Contact

Phone

e-mail

Team

P&H International

Crane Assembly Lead Time Reduction

Greg Ladzinski

414-671-7405

gladzins@phmining.com

Matthew,     J. Schneider, Sculler-Rach

GE Healthcare

MRI Assembly Flow Optimization

Joy Weber

262-894-7956

Joy.Weber@med.ge.com

Cooke, DaVilla, Mencel

Brass Light Gallery

Manufacturing Cell Optimization

Jeff Perkins

414-397-6672

jperkins@brasslight.com

Eirich,  Millin, McGrail

Froedtert Hospital

Pneumatic Tube System

Beth Lanham

414-805-8685

blanham@fmlh.edu

Kozey,         B. Schneider, Liu

North American Clutch

Powder Metal Part Production

Guy Campbell

 

guycc@noram-clutch.com

Krauska, Meyer, Reger

 

 


Project Deliverables

 

Click on deliverables to see descriptions.  Case studies provide examples of what each deliverable might look like.

 

 

Case Studies

 

 

 

Waukesha Foundry

Day Hospital

Deliverable

Report

Present.

Report

Present.

1.      Project Overview

X

X

X

X

2.      System Description

X

X

X

X

3.      Context Diagram

X

X

X

X

4.      Data Flow Diagram

X

X

X

5.      State Transition Diagram

X

X

X

6.      Process Flow Diagram

X

X

X

7.      Entity Relationship Diagram

8.      IBIS Analysis

9.      Causal Loop Diagram

10.    Arena Simulation

X

11.    Final Presentation

12.    Supplemental Materials

 


Deliverable Instructions:

 

·         Each deliverable should be created as a Microsoft documents in the format noted in each description.

·         Teams should be prepared to discuss their deliverables in class on the due dates posted on course schedule.

·         The final report should contain a summary of the deliverables, and should include all of the deliverables as appendices.

·         There is no minimum or maximum length for the final report.

·         The final presentation should consist of a 20 minute max. summary of the final report.

·         Teams will make final presentations to the class and sponsors on the date posted on the course schedule.

·         Deliverables, final report, and final presentation should contain no references to the name of the project sponsor, and should not contain any information that would allow the sponsor company to be identified.

·         All deliverable documents must be submitted before 5:00 on the due date by depositing in the associated D2L discussion section for this course.

 


Project Peer Reviews:

 

Please go to this link for a description of the project peer review process for this course.

 


Contact the webmaster